ProCable, Brasil - South America, 2012
|
|
- Country: Brasil, South America
- Contractor: LIG Global
- End-User: ProCable
- Description: Permanent PD and DTS monitoring system on cable circuits
- Installation year: 2012
- Location: Power plant, outdoor
- EUT: Three-phase 230 kV cable circuits
- Monitored accessories: N. 23 three-phase cable joints and N.2 cable terminations
- Sensors: High Frequency Current Tranformer into link boxes
- Technical notes: DTS monitoring system included
|
|