Simultaneus PD Testing

Techimp is a world-leader company with outstanding field-proven competencies and experience in on-site HV cable testing.
During a simultaneous PD test, one or more operators are available to perform measurements on each accessory simultaneously. Sensors and acquisition units (one for each 3/6 phases) are interconnected through a fiber optic ring. Acquisitions are stored in the device internal memory and can be downloaded in a later stage in total safety.
Simultaneous PD Tests are normally performed during a High Voltage Cable Commissioning Tests.

   

simultaeous

Typical “daisy chaining” of the PD measurement chain along the cable route

 

 

More info? The easiest way to contact us is to email us by filling out this form, or directly by This email address is being protected from spambots. You need JavaScript enabled to view it.

Assets